Bathroom Refurbishment Bounds Green

Bathroom Refurbishment Bounds Green

This bathroom was originally in two sections, we removed all the partitions, ceiling and floor boards as the joists underneath needed to be strengthened.

New spotlights and shaver point were wired.

A walk in shower with aqua panelling was fitted. A shelved basin, toilet and two towel radiators were also installed.

The floor was plyed and an amtico floor covering was laid. New skirting and sills were fitted and a complete redecoration.